THE PRO EXPERIENCE
Your jobs. Today’s plan.
Plan each site, protect the full window and keep the evidence.
Watch: confirm before relying on this
Record the compacted lift thickness before relying on the paving call. Confirm the receiving pavement is not wet or muddy Confirm this with current field or job evidence before starting. Confirm the receiving pavement and base are not frozen Confirm this with current field or job evidence before starting. Confirm approved mix, truck/roller sequence, actual mix temperatures and the compaction acceptance plan Confirm this with current field or job evidence before starting.
Wednesday, Sep 9
- Work
- Wrap
- Protect
- After the shift
- Over your limit
- 9 AM78°10%Work
- 10 AM79°10%Work
- 11 AM80°10%Wrap
- 12 PM80°35%Protect
- 1 PM80°75%Protect
- 2 PM80°75%
- 3 PM80°75%
- 4 PM80°75%
- 5 PM80°75%
- 6 PM80°10%
- 7 PM67°10%
- 8 PM67°10%
- 9 PM67°10%
- 10 PM67°10%
- 11 PM67°10%
- 12 AM67°10%
Sample scenario, not live weather · rain chance bars are per hour · limits are your company's own
Sun and clouds, dry
Sample scenario, not live weather
- Binding limit
- Confirmation needed
- Next change
- No change expected inside the checked window; recheck when the forecast updates.
- Now
- Radar at the job: no rain (sample frame 8:58 AM CDT)Nearest station report: sun and clouds, 78°F (sample report 8:51 AM CDT)Sample scenario, not live weather
- Checked
- 9:00 AM CDT · forecast issued 0 min earlier
Record the compacted lift thickness before relying on the paving call.
Job mode: Unspecified. The stricter New / full construction rules apply until a mode is saved.
Weather need for Asphalt paving - driveways: Needs suitable temperatures for each asphalt layer and enough time to compact it.
Kansas hot-mix default accepts either air at least 50°F or measured receiving surface at least 55°F for a surface course. The contract and approved mix control; other mix types can require different limits.
New/full construction also requires accepted subgrade, drainage and base before trucks arrive.
Wind, lift thickness, actual mix and base temperatures set the compaction window. The forecast does not establish delivered mix temperature or density.
Assumptions (7) and sources
- Company ruleWrap buffer of 30 minutes is your company rule.
- Field check neededAssumes this shop rule condition is met at start: Confirm the receiving pavement is not wet or muddy. Check at arrival.
- Field check neededAssumes this shop rule condition is met at start: Confirm the receiving pavement and base are not frozen. Check at arrival.
- Field check neededAssumes this shop rule condition is met at start: Confirm approved mix, truck/roller sequence, actual mix temperatures and the compaction acceptance plan. Check at arrival.
- SpecificationHot-mix placement defaults come from the adopted construction specification. The job's contract, approved mix and special provisions control; no warm-mix reduction is assumed.Source document
- Shop ruleShop rule: no rain during the work.
- Forecast timingAssumes the forecast issued 0 minutes ago is still current. Official forecasts are reissued at least twice a day and sooner when weather changes; a forecast older than 13 hours is treated as stale.
- SpecificationAdopted hot-mix air minimum 50°F (air or measured surface)Source document
- SpecificationAdopted hot-mix receiving surface minimum 55°F (air or measured surface)Source document
- SpecificationAdopted hot-mix air temperature at least 50°FSource document
- Shop ruleNo rain during the work
ContractorWeather planning margin: 3°F on temperature, 2°F on dew-point spread, 30% rain chance in any hour, 5 mph on wind. Rain counts as expected at 60% or more.
A planning call based on the forecast and the rules shown. It is not a warranty or proof of compliance.
Beyond a single jobsite.
Real regional imagery. Pan and zoom to follow the wider scene. Sample job pins are illustrative; the demo’s work plans use separate fictional weather.
- NowRaining at the job: no (sample radar frame 8:58 AM CDT, 2 min old)Sample scenario, not live weather
- +5 minNo rain in the sample minute timeline, 9:05 AM–9:10 AM; 10% chance that hourSample scenario, not live weather
- +15 minNo rain in the sample minute timeline, 9:15 AM–9:20 AM; 10% chance that hourSample scenario, not live weather
- +30 minNo rain in the sample minute timeline, 9:30 AM–9:35 AM; 10% chance that hourSample scenario, not live weather
- +60 minRain chance stays under 30% through 10 AM (up to 10%)
- +120 minRain chance stays under 30% through 11 AM (up to 10%)
- Rest of todayRain chance 30% or more from 12 PM to 6 PM (up to 75%)
- TomorrowRain chance stays under 30% (up to 10%)
Sample scenario, not live weather. Now and the minute rows are sample values made from this scenario's hours; live radar and station reports are not read for sample job pins.