Interactive demoSample scenario, not live weather · live address check and real radar are labeled separately.Use it for your jobs
CW
Your sample workspaceWednesday, September 9 · 9:00 AM

THE PRO EXPERIENCE

Your jobs. Today’s plan.

Plan each site, protect the full window and keep the evidence.

Try a different day
Sample · Sep 9, 2026
Asphalt repair & patching (potholes, infrared) · Perform selected workInstall cold patchAsphalt repair & patching (potholes, infrared) sample job · Finishing crew
PRO · YOUR FULL WORK WINDOWSample scenario, not live weather · sample company plan
WATCH

Watch: confirm before relying on this

Record the compacted lift thickness before relying on the paving call. Confirm the receiving pavement is not wet or muddy Confirm this with current field or job evidence before starting. Confirm the receiving pavement and base are not frozen Confirm this with current field or job evidence before starting. Confirm approved mix, truck/roller sequence, actual mix temperatures and the compaction acceptance plan Confirm this with current field or job evidence before starting.

Planned work9:00 AM–11:00 AM
Wrap byFits the checked windowConfirmation needed
After the shiftNo after-work requirement is set for this job; pick the product or set a protection time to check the hours after work.Checked through Wed 11:00 AM
The day, hour by hour

Wednesday, Sep 9

  • Work
  • Wrap
  • Protect
  • After the shift
  • Over your limit
  1. 9 AM78°10%Work
  2. 10 AM79°10%Work
  3. 11 AM80°10%Wrap
  4. 12 PM80°35%Protect
  5. 1 PM80°75%Protect
  6. 2 PM80°75%
  7. 3 PM80°75%
  8. 4 PM80°75%
  9. 5 PM80°75%
  10. 6 PM80°10%
  11. 7 PM67°10%
  12. 8 PM67°10%
  13. 9 PM67°10%
  14. 10 PM67°10%
  15. 11 PM67°10%
  16. 12 AM67°10%

Sample scenario, not live weather · rain chance bars are per hour · limits are your company's own

West-side demo pinSAMPLE WEATHER
78°F

Sun and clouds, dry

14 mphGusts
67%Humidity
64°Dew point
78°Air temperature

Sample scenario, not live weather

Binding limit
Confirmation needed
Next change
No change expected inside the checked window; recheck when the forecast updates.
Now
Radar at the job: no rain (sample frame 8:58 AM CDT)Nearest station report: sun and clouds, 78°F (sample report 8:51 AM CDT)Sample scenario, not live weather
Checked
9:00 AM CDT · forecast issued 0 min earlier

Record the compacted lift thickness before relying on the paving call.

Job mode: Unspecified. The stricter New / full construction rules apply until a mode is saved.

Weather need for Asphalt repair & patching (potholes, infrared): Freezing and thawing can create new damage; check the pavement before planning repairs.

Kansas hot-mix default accepts either air at least 50°F or measured receiving surface at least 55°F for a surface course. The contract and approved mix control; other mix types can require different limits.

New/full construction also requires accepted subgrade, drainage and base before trucks arrive.

Wind, lift thickness, actual mix and base temperatures set the compaction window. The forecast does not establish delivered mix temperature or density.

Assumptions (7) and sources
  • Company ruleWrap buffer of 30 minutes is your company rule.
  • Field check neededAssumes this shop rule condition is met at start: Confirm the receiving pavement is not wet or muddy. Check at arrival.
  • Field check neededAssumes this shop rule condition is met at start: Confirm the receiving pavement and base are not frozen. Check at arrival.
  • Field check neededAssumes this shop rule condition is met at start: Confirm approved mix, truck/roller sequence, actual mix temperatures and the compaction acceptance plan. Check at arrival.
  • SpecificationHot-mix placement defaults come from the adopted construction specification. The job's contract, approved mix and special provisions control; no warm-mix reduction is assumed.Source document
  • Shop ruleShop rule: no rain during the work.
  • Forecast timingAssumes the forecast issued 0 minutes ago is still current. Official forecasts are reissued at least twice a day and sooner when weather changes; a forecast older than 13 hours is treated as stale.
  • SpecificationAdopted hot-mix air minimum 50°F (air or measured surface)Source document
  • SpecificationAdopted hot-mix receiving surface minimum 55°F (air or measured surface)Source document
  • SpecificationAdopted hot-mix air temperature at least 50°FSource document
  • Shop ruleNo rain during the work

ContractorWeather planning margin: 3°F on temperature, 2°F on dew-point spread, 30% rain chance in any hour, 5 mph on wind. Rain counts as expected at 60% or more.

A planning call based on the forecast and the rules shown. It is not a warranty or proof of compliance.

THE WEATHER IN MOTION

Beyond a single jobsite.

Real regional imagery. Pan and zoom to follow the wider scene. Sample job pins are illustrative; the demo’s work plans use separate fictional weather.

Opening live radar…
  1. NowRaining at the job: no (sample radar frame 8:58 AM CDT, 2 min old)Sample scenario, not live weather
  2. +5 minNo rain in the sample minute timeline, 9:05 AM–9:10 AM; 10% chance that hourSample scenario, not live weather
  3. +15 minNo rain in the sample minute timeline, 9:15 AM–9:20 AM; 10% chance that hourSample scenario, not live weather
  4. +30 minNo rain in the sample minute timeline, 9:30 AM–9:35 AM; 10% chance that hourSample scenario, not live weather
  5. +60 minRain chance stays under 30% through 10 AM (up to 10%)
  6. +120 minRain chance stays under 30% through 11 AM (up to 10%)
  7. Rest of todayRain chance 30% or more from 12 PM to 6 PM (up to 75%)
  8. TomorrowRain chance stays under 30% (up to 10%)

Sample scenario, not live weather. Now and the minute rows are sample values made from this scenario's hours; live radar and station reports are not read for sample job pins.

ONE LEVEL DEEPER

Check the product behind the plan.

Choose the material, review its source and explore a sample work-window check.