Interactive demoSample scenario, not live weather · live address check and real radar are labeled separately.Use it for your jobs
CW
Your sample workspaceWednesday, September 9 · 9:00 AM

THE FREE EXPERIENCE

Your jobsite forecast.

One job. Useful weather. A plan you can carry into the day.

Try a different day
Sample · Sep 9, 2026
Exterior painting & staining · Apply coatingSpray exterior coatingMaple exterior · Finishing crew
FREE · TODAY’S CALLSample scenario, not live weather · sample company plan
HOLD

Hold: rain

75% rain chance at 1:00 PM, over your 40% limit. There isn't time to work and still leave 4 hours 30 minutes for wrap and protection before it (your company rule).

Planned work9:00 AM–11:00 AM
Start callDon't start this windowRain chance no more than 40%
After the shiftAfter work, this could undo the jobChecked through Wed 3:00 PM
The day, hour by hour

Wednesday, Sep 9

  • Work
  • Wrap
  • Protect
  • After the shift
  • Over your limit
  1. 9 AM78°10%Work
  2. 10 AM79°10%Work
  3. 11 AM80°10%Wrap
  4. 12 PM80°35%Protect
  5. 1 PM80°75%Protect
  6. 2 PM80°75%Protect
  7. 3 PM80°75%Protect
  8. 4 PM80°75%
  9. 5 PM80°75%
  10. 6 PM80°10%
  11. 7 PM67°10%
  12. 8 PM67°10%
  13. 9 PM67°10%
  14. 10 PM67°10%
  15. 11 PM67°10%
  16. 12 AM67°10%

Sample scenario, not live weather · rain chance bars are per hour · limits are your company's own

SponsorNational Pavement Maintenance Contractors AssociationPavement trade resources at npmca.org. No warranty or product approval is implied.

TRADE-WEATHER DESK · FREE

Sample area (not a real place)

One area, city or ZIP level. Today's call for each trade, the week ahead and radar now.

Sample scenario, not live weather

138 trades across 20 families.
Selected: Exterior painting & staining
Today, starting 9:00 AM CDT · checked for a half-dayRadar at the area center: no rain (sample frame 8:58 AM CDT). Sample scenario, not live weather

Checked for a half-day (4 hours) at the center of Sample area (not a real place), plus each trade's shop rule protection time. Conditions at your job can differ; confirm on site.

AREA FORECAST · TIMES IN CDT Sample scenario, not live weather

This hour9 AM Wed78°10%8 mphGust 14 mphHumidity 67%
10 AM Wed79°10%8 mphGust 14 mphHumidity 67%
11 AM Wed80°10%8 mphGust 14 mphHumidity 67%
12 PM Wed80°35%8 mphGust 14 mphHumidity 67%
1 PM Wed80°75%17 mphGust 27 mphHumidity 87%
2 PM Wed80°75%17 mphGust 27 mphHumidity 87%
3 PM Wed80°75%17 mphGust 27 mphHumidity 87%
4 PM Wed80°75%17 mphGust 27 mphHumidity 87%
5 PM Wed80°75%17 mphGust 27 mphHumidity 87%
6 PM Wed80°10%8 mphGust 14 mphHumidity 67%
7 PM Wed67°10%8 mphGust 14 mphHumidity 67%
8 PM Wed67°10%8 mphGust 14 mphHumidity 67%
TodayRain expected80° / 67°75% peak chance
Thu, Sep 10Sun and clouds, dry82° / 67°10% peak chance
Fri, Sep 11Rain expected79° / 65°75% peak chance
Sat, Sep 12Sun and clouds, dry79° / 63°10% peak chance
Sun, Sep 13Sun and clouds, dry83° / 63°10% peak chance
Mon, Sep 14Rain expected80° / 64°75% peak chance
Tue, Sep 15Rain expected81° / 64°75% peak chance

TOMORROW AND THE WEEK AHEAD

Which day fits this job?

Sample scenario, not live weather

Tomorrow · Thu, Sep 10

Start between 7 AM and 3 PM: WORK. Each start is checked for the full work and protection time.

  1. 5 AMWATCHAir is only 3°F above the dew point; the shop rule wants the wall surface at least 5°F above it. Measure at arrival
  2. 6 AMWATCHAir is only 3°F above the dew point; the shop rule wants the wall surface at least 5°F above it. Measure at arrival
  3. 7 AMWORK
  4. 8 AMWORK
  5. 9 AMWORK
  6. 10 AMWORK
  7. 11 AMWORK
  8. 12 PMWORK
  9. 1 PMWORK
  10. 2 PMWORK
  11. 3 PMWORK
  12. 4 PMWATCHAir is only 4°F above the dew point; the shop rule wants the wall surface at least 5°F above it. Measure at arrival
  13. 5 PMWATCHAir is only 4°F above the dew point; the shop rule wants the wall surface at least 5°F above it. Measure at arrival
  14. 6 PMWATCHAir is only 4°F above the dew point; the shop rule wants the wall surface at least 5°F above it. Measure at arrival
  1. Fri, Sep 11MarginalRain likely during the day, inside the protection time; plan to wrap early.From the hourly forecast
  2. Sat, Sep 12GoodEvery checked limit holds with margin.From the hourly forecast
  3. Sun, Sep 13GoodEvery checked limit holds with margin.From the hourly forecast
  4. Mon, Sep 14PoorRain likely during the day.From the hourly forecast
  5. Tue, Sep 15PoorRain likely during the day.From the hourly forecast

Days 8 to 14: Unavailable: the 8 to 14 day trend isn't switched on.

Planning grades for this trade and product, not a schedule. Nothing moves a crew automatically; recheck as each day comes into the hourly forecast.

Street-level pins for each jobPro checks the exact address, not the area center.
Every active job on one boardPro keeps several jobs side by side, sorted by the next change.
Rain-change alertsPro tells you when the call changes, and when it clears.
West-side demo pinSAMPLE WEATHER
78°F

Sun and clouds, dry

14 mphGusts
67%Humidity
64°Dew point
78°Air temperature
YOUR WORKDAY, EXPLAINED

The work has a window. So does the drying.

The sample forecast changes this afternoon. Include time to secure the job and protect what you have already applied.

Sample scenario, not live weather

Binding limit
Rain chance no more than 40%
Next change
12:00 PM CDT
Now
Radar at the job: no rain (sample frame 8:58 AM CDT)Nearest station report: sun and clouds, 78°F (sample report 8:51 AM CDT)Sample scenario, not live weather
Checked
9:00 AM CDT · forecast issued 0 min earlier

Job mode: Unspecified. The stricter New / full construction rules apply until a mode is saved.

Weather need for Exterior painting & staining: Needs dry surfaces and temperatures suited to the coating; plan work around sun and shade.

Assumptions (4) and sources
  • Company ruleWrap buffer of 30 minutes is your company rule.
  • Shop ruleShop rule: minimum air temperature of 35°F with no product selected.
  • Shop ruleShop rule: wall surface at least 5°F above the dew point. Forecast air stays clear of it; the forecast does not measure the surface.
  • Forecast timingAssumes the forecast issued 0 minutes ago is still current. Official forecasts are reissued at least twice a day and sooner when weather changes; a forecast older than 13 hours is treated as stale.
  • Company ruleRain chance no more than 40%
  • Company ruleWind gusts no more than 18 mph
  • Company ruleAir temperature no more than 95°F
  • Shop ruleAir temperature at least 35°F
  • Shop ruleWall surface at least 5°F above the dew point (forecast check, watch only)

ContractorWeather planning margin: 3°F on temperature, 2°F on dew-point spread, 30% rain chance in any hour, 5 mph on wind. Rain counts as expected at 60% or more.

A planning call based on the forecast and the rules shown. It is not a warranty or proof of compliance.

  1. NowRaining at the job: no (sample radar frame 8:58 AM CDT, 2 min old)Sample scenario, not live weather
  2. +5 minNo rain in the sample minute timeline, 9:05 AM–9:10 AM; 10% chance that hourSample scenario, not live weather
  3. +15 minNo rain in the sample minute timeline, 9:15 AM–9:20 AM; 10% chance that hourSample scenario, not live weather
  4. +30 minNo rain in the sample minute timeline, 9:30 AM–9:35 AM; 10% chance that hourSample scenario, not live weather
  5. +60 minRain chance stays under 30% through 10 AM (up to 10%)
  6. +120 minRain chance stays under 30% through 11 AM (up to 10%)
  7. Rest of todayRain chance 30% or more from 12 PM to 6 PM (up to 75%)
  8. TomorrowRain chance stays under 30% (up to 10%)

Sample scenario, not live weather. Now and the minute rows are sample values made from this scenario's hours; live radar and station reports are not read for sample job pins.

SEE WHAT PRO ADDS

Your whole operation, in view.

Choose the material, review its source and explore a sample work-window check.